The U.S. Environmental Protection Agency and the Occupational Safety and Health Administration (OSHA) are responsible for regulating environmental exposure and protecting workers from asbestos exposure. OSHA is responsible for the health and safety of workers who may be exposed to asbestos in the work place, or in connection with their jobs. EPA is responsible for developing and enforcing regulations necessary to protect the general public from exposure to airborne contaminants that are known to be hazardous to human health.
The EPA's Worker Protection Rule (40 CFR Part 763, Subpart G) extends the OSHA standards to state and local employees who perform asbestos work and who are not covered by the OSHA Asbestos Standards, or by a state OSHA plan. The Rule parallels OSHA requirements and covers medical examinations, air monitoring and reporting, protective equipment, work practices, and record keeping. In addition, many State and local agencies have more stringent standards than those required by the Federal government. People who plan to renovate or remove asbestos from a building of a certain size, or who plan to demolish any building, are required to notify the appropriate federal, state and local agencies, and to follow all federal, state, and local requirements for removal and disposal of regulated asbestos-containing material (RACM).
EPA's advice on asbestos is neither to rip it all out in a panic nor to ignore the problem under a false presumption that asbestos is "risk free." Rather, EPA recommends a practical approach that protects public health by emphasizing that asbestos material in buildings should be located, that it should be appropriately managed, and that those workers who may disturb it should be properly trained and protected. That has been, and continues to be, EPA's position. The following summarizes the five major facts that the Agency has presented in congressional testimony:
FACT ONE: Although asbestos is hazardous, human risk of asbestos disease depends upon exposure.
FACT TWO: Prevailing asbestos levels in buildings -- the levels school children and you and I face as building occupants -- seem to be very low, based upon available data. Accordingly, the health risk we face as building occupants also appears to be very low.
FACT THREE: Removal is often not a school district's or other building owner's best course of action to reduce asbestos exposure. In fact, an improper removal can create a dangerous situation where none previously existed.
FACT FOUR: EPA only requires asbestos removal in order to prevent significant public exposure to asbestos, such as during building renovation or demolition.
FACT FIVE: EPA does recommend in-place management whenever asbestos is discovered. Instead of removal, a conscientious in- place management program will usually control fiber releases, particularly when the materials are not significantly damaged and are not likely to be disturbed.
What are EPA's regulations governing asbestos?
TSCA
In 1979, under the Toxic Substances Control Act (TSCA), EPA began an asbestos technical assistance program for building owners, environmental groups, contractors and industry. In May 1982, EPA issued the first regulation intended to control asbestos in schools under the authority of TSCA; this regulation was known as the Asbestos-in-Schools Rule. Starting in 1985, loans and grants have been given each year to aid Local Education Agencies (LEAs) in conducting asbestos abatement projects under the Asbestos School Hazard Abatement Act (ASHAA).
AHERA
In 1986, the Asbestos Hazard Emergency Response Act (AHERA; Asbestos Containing Materials in Schools, 40 CFR Part 763, Subpart E) was signed into law as Title II of TSCA. AHERA is more inclusive than the May 1982 Asbestos-in-Schools Rule. AHERA requires LEAs to inspect their schools for asbestos containing building materials (ACBM) and prepare management plans which recommend the best way to reduce the asbestos hazard. Options include repairing damaged ACM, spraying it with sealants, enclosing it, removing it, or keeping it in good condition so that it does not release fibers. The plans must be developed by accredited management planners and approved by the State. LEAs must notify parent, teacher and employer organizations of the plans, and then the plans must be implemented. AHERA also requires accreditation of abatement designers, contractor supervisors and workers, building inspectors, and school management plan writers. Those responsible for enforcing AHERA have concentrated on educating LEAs, in an effort to ensure that they comply with the regulations. Contractors that improperly remove asbestos from schools can be liable under both AHERA and NESHAP. For more information on AHERA, request the pamphlet entitled "The ABC's of Asbestos in Schools" from the EPA Public Information Center.
NESHAP
The Clean Air Act (CAA) of 1970 requires EPA to develop and enforce regulations to protect the general public from exposure to airborne contaminants that are known to be hazardous to human health. In accordance with Section 112 of the CAA, EPA established National Emission Standards for Hazardous Air Pollutants (NESHAP). Asbestos was one of the first hazardous air pollutants regulated under Section 112. On March 31, 1971, EPA identified asbestos as a hazardous pollutant, and on April 6, 1973, EPA promulgated the Asbestos NESHAP in 40 CFR Part 61, Subpart M. The Asbestos NESHAP has been amended several times, most recently in November 1990. For a copy of the Asbestos NESHAP contact the Asbestos NESHAP Coordinators listed in the Appendix.
What are the basic requirements of the Asbestos NESHAP?
The Asbestos NESHAP is intended to minimize the release of asbestos fibers during activities involving the handling of asbestos. Accordingly, it specifies work practices to be followed during renovations of buildings which contain a certain threshold amount of friable asbestos, and during demolitions of all structures, installations, and facilities (except apartment buildings that have no more than four dwelling units). Most often, the Asbestos NESHAP requires action to be taken by the person who owns, leases, operates, controls, or supervises the facility being demolished or renovated (the "owner"), and by the person who owns, leases, operators, controls or supervises the demolition or renovation (the "operator"). The regulations require owners and operators subject to the Asbestos NESHAP to notify delegated State and local agencies and/or their EPA Regional Offices before demolition or renovation activity begins. The regulations restrict the use of spray asbestos, and prohibit the use of wet applied and molded insulation (i.e., pipe lagging). The Asbestos NESHAP also regulates asbestos waste handling and disposal.
Why was the Asbestos NESHAP recently amended?
The Asbestos NESHAP was amended for several reasons. EPA wanted to clarify existing regulatory policies, and to add regulations which explicitly address monitoring and record keeping at facilities which mill, manufacture, and fabricate asbestos. Also, because of the high risk associated with the transfer and disposal of ACM, EPA also wanted to strengthen the requirements which govern asbestos waste disposal by requiring tracking and record keeping. Furthermore, EPA determined that the Asbestos NESHAP needed to take into account the availability of improved emission controls. EPA also wanted to make the NESHAP consistent with other EPA statutes that regulate asbestos.
What sources are now covered by the asbestos NESHAP?
The following activities and facilities are currently regulated by the Asbestos NESHAP:
The milling of asbestos.
Roadways containing ACM.
The commercial manufacture of products that contain commercial asbestos.
The demolition of all facilities.
The renovation of facilities that contain friable ACM.
The spraying of ACM.
The processing (fabricating) of any manufactured products that contain asbestos.
The use of insulating materials that contain commercial asbestos.
The disposal of asbestos-containing waste generated during milling, manufacturing, demolition, renovation, spraying, and fabricating operation.
The closure and maintenance of inactive waste disposal sites.
The operation of and reporting on facilities that convert asbestos containing waste material into non-asbestos material.
The design and operation of air cleaning devices.
The reporting of information pertaining to process control equipment, filter devices, asbestos generating processes, etc.
Active waste disposal sites.
What were the major changes to the Asbestos NESHAP?
Milling, Manufacturing, and Fabricating Sources
Businesses which are involved in asbestos milling, manufacturing, and fabricating now must monitor for visible emissions for at least 15 seconds at least once a day (during daylight hours), and inspect air cleaning devices at least once a week. The facilities must maintain records of the results, and submit each quarter a copy of the visible emissions monitoring records if visible emissions occurred during the quarter. Facilities that install fabric filters (to control asbestos emissions) after the effective date of the revision must provide for easy inspection of the bags.
Demolition and Renovation
All facilities which are "demolished" are subject to the Asbestos NESHAP. The definition of demolition was expanded to include the intentional burning of a facility, in addition to the "wrecking or taking out . . . any load-supporting structural member of a facility." Owners and operators of all facilities which are to be demolished, and of facilities that contain a certain amount of asbestos which are to be renovated, must now provide more detailed information in notifications, including the name of the asbestos waste transporter and the name of the waste disposal site where the ACM will be deposited.
Owners and operators must give a 10-day notice for planned renovations and demolitions. They must renotify EPA in advance of the actual start date if the demolition or renovation will begin on a date other than the one specified in the original notification. Telephone re- notifications are permitted, but must be followed by written notice.
Starting one year after promulgation of the regulation, a person trained in the provisions of the Asbestos NESHAP, and in the methods of complying with them, must supervise operations in which ACM is stripped, removed or otherwise handled. This supervisor is responsible for all on-site activity. Before wetting is suspended, the EPA administrator must approve. When wetting of asbestos during its removal is suspended due to freezing temperatures, owners or operators must measure the air temperature in the work area three times during the workday, and must keep those records for at least two years.
The revisions also clarify EPA's position regarding the handling and treatment of non- friable asbestos material. The owner and operator must inspect the site for the presence of non-friable ACM, and include in the notification an estimate of how much non-friable ACM is present. Also, the owner and operator must describe the procedures to be followed if unexpected ACM is found in the course of demolition or renovation, and if non-friable asbestos becomes friable in the course of renovation or demolition.
Waste Transport and Disposal
Vehicles used to transport ACM must be marked according to new guidelines during loading and unloading. Labels indicating the name of the waste generator and the location where the waste was generated must be placed on containers of RACM. When ACM waste is transported off-site, a waste shipment record (WSR) must be given to the waste site operator or owner at the time that the waste is delivered to the waste disposal site. The owner or operator must send a signed copy of the WSR back to the waste generator within 30 days, and attempt to reconcile any discrepancy between the quantity of waste given on the WSR and the actual amount of waste received. If, within 15 days of receiving the waste, the waste site owner or operator cannot reconcile the discrepancy, he or she must report that problem to the same agency that was notified about the demolition or renovation. New disposal sites must apply for approval to construct, and must notify EPA of the startup date. Existing disposal sites must supply EPA with certain information concerning their operations, such as the name and address of the owner or operator, the location of the site, the average weight per month of the hazardous materials being processed, and a description of the existing emission control equipment. If a copy of the WSR signed by the waste site owner or operator is not received by the waste generator within 35 days of the date that the waste was accepted by the initial transporter, the waste generator must contact the transporter and/or disposal site owner or operator to determine the status of the waste shipment. If a signed copy of the WSR is not received within 45 days of the date that the waste was accepted by the initial transporter, the waste generator must submit a written report to the same agency that was notified about the demolition or renovation.
Owners of disposal sites must record on the deed to the disposal site that the property has been used for ACM disposal. They must also keep records that show the location, depth, area and volume of the asbestos waste; they must indicate on the deed that these records are available. Owners of inactive disposal sites must obtain written approval before they excavate or otherwise disturb ACM waste that has been deposited on the site.
Where can I get more information?
There are ten EPA Regional Offices around the country. You can obtain more information about the Asbestos NESHAP by contacting your EPA Regional Office's NESHAP coordinator or the appropriate State or local agency. You can obtain more information about AHERA by contacting your EPA Regional Asbestos Coordinator (RAC). You may also call the EPA Toxic Substances Control Act (TSCA) Hotline to ask general questions about asbestos, or to request asbestos guidance documents. The Hotline number is (202) 554-1404. The EPA Public Information Center can send you information on EPA regulations. You can reach the center at (202) 382-2080 or (202) 475-7751. The Office of the Federal Register (202-382- 5475) can send you copies of any regulations published in The Federal Register, including the Asbestos NESHAP. Finally, the EPA has an Asbestos Ombudsman to provide information on the handling and abatement of asbestos in schools, the work place and the home. Also, the EPA Asbestos Ombudsman can help citizens with asbestos-in-school complaints. The Ombudsman can be reached toll-free at (800) 368-5888, direct at (703) 557- 1938 or 557-1939.
Source: Stationary Source Compliance Division of the U.S. Environmental Protection Agency
No comments:
Post a Comment